OFFLINE TOOL / OEE V1.4
PRODUCTION / 020OFFLINE

OEE calculator

Availability, performance and quality from planned time, downtime, ideal cycle time and counts, with TEEP, the six big losses and several shifts or lines.

Calculate

Shift input

Shift time and planned stops give the planned production time. The ideal cycle time is the fastest the machine is designed to run one unit (nameplate or a validated best), not the average. Calendar time is optional: 1440 min for a day.

Split the losses (optional)

Minor stops are short stops that are not in the downtime record; the rest of the performance loss is reduced speed. Startup rejects are the rejects made while the process was warming up; the rest are production rejects.

Paste, open a CSV, TSV, TXT or XLSX file (up to 20 MB), or drop it on the field. Files are read in this browser only.

Columns

Found by the header names, or in the order Reason, Minutes, Loss. Change them if they are wrong.

Reason        Minutes   Loss
Pump fault    22        Breakdown
Mould change  25        Setup
Long format
1 row = 1 stop

Columns: tab, ; or ,
Decimals: 12,5 or 12.5

Paste measurements to start.

One row per stop: reason, minutes and, if you like, the loss (Breakdown, Setup or adjustment; anything else counts as other downtime). While the list has rows its sum is the unplanned downtime.

Runs in this browser. Data is not uploaded or stored.

Shift results

—OEE
—Availability
—Performance
—Quality
—TEEP

    Shifts or lines input

    Paste, open a CSV, TSV, TXT or XLSX file (up to 20 MB), or drop it on the field. Files are read in this browser only.

    Columns

    Found by the header names, or in the order Shift / line, Planned (min), Downtime (min), Ideal cycle (s), Total count, Good count, Rejects. Change them if they are wrong.

    Shift    Planned   Downtime  Ideal     Total     Good
    A early  450       32        24        940       912
    Long format
    1 row = 1 shift or line

    Columns: tab, ; or ,
    Decimals: 12,5 or 12.5

    Paste measurements to start.

    One row per shift, day or line: planned production time (breaks already taken off) and unplanned downtime in minutes, the ideal cycle time in seconds per unit, the total count and the good count or the rejects.

    Runs in this browser. Data is not uploaded or stored.

    Shifts or lines results

    —OEE of the totals
    —Mean of row OEEs
    —Availability
    —Performance
    —Quality

      How OEE is calculated

      Overall equipment effectiveness (OEE) is the share of the planned production time in which a machine or line made good parts at its ideal speed. It splits the gap to 100 % into three losses, so that a single number points to where the time went: stops (availability), slow or interrupted running (performance) and bad parts (quality).

      Formulas

      Worked example (the tool's example)

      1. An 8-hour shift is 480 min. Two breaks and a meeting take 40 min, so the planned production time is 480 − 40 = 440 min.
      2. The downtime list has a pump fault (22 min, breakdown), a mould change (25 min) and a colour change adjustment (8 min): 55 min of downtime, so the run time is 440 − 55 = 385 min and A = 385 / 440 = 87.5 %.
      3. The ideal cycle time is 24 s and 820 shots were made: net run time = 24 × 820 / 60 = 328.0 min, P = 328.0 / 385 = 85.2 %. The missing 57 min are performance loss: 18 min of recorded minor stops and 39 min of running slower than ideal.
      4. 31 of the 820 were rejects, 789 good: Q = 789 / 820 = 96.2 %. The rejects cost 31 × 24 s = 12.4 min (12 startup rejects 4.8 min, 19 production rejects 7.6 min).
      5. OEE = 0.875 × 0.852 × 0.962 = 71.7 %, the same as 24 × 789 / 60 = 315.6 fully productive minutes out of 440.
      6. With a calendar time of 1440 min the utilization is 440 / 1440 = 30.6 % and TEEP = 315.6 / 1440 = 21.9 %.

      Six big losses

      Several shifts or lines

      Common mistakes

      Input and files

      Questions

      What is a good OEE?
      There is no universal target: OEE depends on the process, the product mix and how the ideal cycle time was set. A figure of 85 % is often quoted as world class for discrete manufacturing, but comparing OEE between different machines or plants says little. Use it to follow one machine or line over time and to see which loss is the largest.
      Are breaks counted as downtime in OEE?
      No. Breaks, meetings and other planned stops are taken off the shift time before OEE starts: OEE is measured against the planned production time. They do lower TEEP, which is measured against the calendar time.
      Why can performance be above 100 %?
      Only when the ideal cycle time is set too slow (too long), or when the counts or the downtime are recorded wrongly. The ideal cycle time must be the fastest cycle the equipment is designed for or has shown, not an average or a planned standard.
      How do I combine the OEE of several shifts or machines?
      Add up the times and counts first and calculate OEE from the sums: the sum of the fully productive time divided by the sum of the planned production time. The plain average of the OEE values gives a short or idle shift the same weight as a full one, so it is not the OEE of the whole period.