OFFLINE TOOL / VALUE STREAM MAP V1.5
LEAN / 038OFFLINE

Value stream map (VSM)

Map a value stream from supplier to customer, current and future state: processes with their data, stock, push, FIFO and supermarket links, information flow, kaizen bursts, lead time, value-added time and PCE.

Example map · Illustrative data: an imaginary bracket line, not from a real plant, customer or supplier. Change anything, open a file or start a new map.

Map

Customer, supplier and information

Takt = available time per day / demand per day. Available time is working time without breaks, in seconds (27000 s = 7.5 h).

Processes in flow order
    Process: Stamping
    Kaizen bursts

      Results

      —Lead time
      —Takt
      —Value-added time
      —Process cycle efficiency

        Current state · choose a process box to edit it
        Future state
        Cycle timeAdded by uptime and scrapOver takt
        Symbols on the map

        Unverified: Value stream mapping symbols as commonly used, written from memory; there is no single standard set. Drawn in FactoKit's own simplified style.

        Outside source
        Supplier or customer, a factory outline with a saw-tooth roof.
        Process box
        One process through which material flows continuously; its data box lists cycle time, change-over, uptime, operators, batch and scrap.
        Inventory
        Triangle with I: stock waiting in front of a process or before shipping, in pieces and days of demand.
        Push arrow
        Thick striped arrow: material is pushed to the next process by a schedule, whether it needs it or not.
        FIFO lane
        Two lines with FIFO and a maximum: first in, first out, with a limited quantity between two processes.
        Supermarket
        Open shelves: a controlled store from which the next process pulls what it needs.
        Electronic information
        Zigzag line: orders, forecasts or schedules sent electronically.
        Manual information
        Straight thin line: information on paper or by word.
        Kaizen burst
        Jagged star: an improvement needed to reach the future state.
        Timeline
        Stock days above, cycle times below; lead time, value-added time and PCE at the end.

        How the value stream map is calculated

        A value stream map follows one product family from the supplier to the customer: the processes, the stock between them, how material moves and how information tells each process what to make. Value stream mapping is a common practice, not a standard; the symbols and metrics here are the usual ones, drawn in FactoKit’s own simplified style.

        Formulas

        Worked example (the tool’s example)

        1. 920 pieces a day in two shifts of 27000 s: takt = 54000 / 920 = 58.7 s.
        2. Current state: 4600 + 1100 + 1600 + 1200 pieces in front of the four processes and 2700 finished are 5.00 + 1.20 + 1.74 + 1.30 + 2.93 = 12.17 days; the cycle times 1 + 39 + 46 + 40 = 126 s add 0.002 days: lead time 12.18 days, PCE 126 / (12.18 × 54000) = 0.019 %.
        3. Assembly (46 s, uptime 90 %, scrap 1 %) runs at an effective 51.6 s: the bottleneck, still under takt.
        4. Future state: SMED at the press cuts the batch and its stock to 1500 pieces, a weld and assembly cell pulls from a supermarket of 300, a FIFO lane of at most 150 feeds packing, and one day of finished goods is kept: lead time 3.07 days, value-added time 93 s, PCE 0.056 %.

        Common mistakes

        Input and files

        Questions

        What is the difference between the current and the future state map?
        The current state shows the value stream as it runs today, drawn from what is seen on the floor: stock counted, cycle times observed. The future state shows how it should run after the improvements, with the kaizen bursts marking what has to change to get there. Make the future state as a copy of the current one and change it.
        How is the lead time on the timeline calculated?
        Each stock is turned into days of customer demand (pieces / demand per day), because a piece waits on average that long before it moves on. The lead time is the sum of these days, the finished goods included, plus the cycle times of the processes expressed in working days. It is a working-day figure, not calendar days.
        What does process cycle efficiency (PCE) tell me?
        PCE = value-added time / lead time, both in working seconds. In most current-state maps it is far below 1 %: a part spends almost all its time waiting in stock. It is a way to show where time goes, not a target for one process; shorten the waiting before speeding up the processes.
        Which process is the bottleneck?
        The one with the longest effective cycle time: the cycle time divided by uptime and by the share of good parts. A process whose effective cycle time is above takt cannot keep up with the customer even when everything else is perfect; the map flags it.