A3 report

Problem solving on one A3 sheet: background, current condition, goal, Ishikawa and 5 Why, countermeasures, plan and the follow-up of one metric with a run chart, gap closed and PDCA status.

Example report · Illustrative data: scrap at an imaginary bracket press, not from a real plant, customer or person. Change anything, open a file or clear it to start your own report.

Status

—Gap closed
—Latest value
—Countermeasures done
—Plan steps done

    The A3 report needs JavaScript in this browser.

    Download offline versionSingle HTML file · v1.5 · 579 KB · works without internet

    Blank template to print or fill in your own program

    How the A3 report works

    An A3 report puts one problem on one sheet of A3 paper: the left half tells the problem (why it matters, what is happening, what should happen, why it happens), the right half what is done about it and whether it worked. It follows PDCA: plan (sections 1–4 and the countermeasures), do (the plan), check (the follow-up), act (standardise or start again). A3 problem solving is a common practice, not a standard; the seven sections here are the usual ones, in FactoKit’s own wording.

    Sections and figures

    Worked example (the tool’s example)

    1. Scrap of a bracket at a press: baseline 4.2 %, target 1.5 %, lower is better.
    2. The Ishikawa diagram marks worn punches with no regrind interval and the missing first-part check as verified; faster strokes and coil thickness are ruled out. A 5 Why chain from the worn punches ends at “no regrind interval was ever set”.
    3. After two of four countermeasures the weekly values fall 4.2, 4.0, 3.1, 2.4, 1.9, 1.7: gap closed = (4.2 − 1.7) / (4.2 − 1.5) = 2.5 / 2.7 = 93 %, target not reached yet; the report stays in Check.

    Common mistakes

    Files

    Questions

    What is an A3 report?
    A way to work through one problem on one sheet of A3 paper, named after the paper size. The left half describes the problem: background, current condition, goal and root cause analysis; the right half the countermeasures, the plan and the follow-up. Its value is the thinking it forces and the conversation it starts, not the form itself.
    How is an A3 report different from an 8D report?
    Both use the same root cause tools. An 8D report is the usual answer to a customer complaint, with a team, containment of the defect and formal closure. An A3 report is lighter and fits any problem or improvement inside the plant, from scrap to change-over time, and follows plan, do, check, act on one sheet.
    What does gap closed mean?
    How much of the way from the baseline to the target the latest value has gone: (baseline − latest) / (baseline − target). 0 % means no change, 100 % the target reached, more than 100 % beyond the target, a negative value that the metric got worse. It works for metrics where lower is better and where higher is better.
    When is an A3 report finished?
    When the follow-up shows that the target is reached and holds, and the countermeasures are made the standard (work instructions, maintenance plans, training), shared with similar processes, and the open questions are written down as next steps. Then the status moves from Check to Act.